How to make concrete is a materials question, not a demolition question. Concrete is cement, water, sand, and stone mixed so the cement can harden around the aggregate. A bag from a home center and a ready-mix truck both start there. The job changes when the opening is already cut into a floor that a building still uses.
Call (470) 345-2816 to review the demolition, cutting, or scanning scope or use the contact form.
All Pro Demolition is a Georgia demolition, concrete cutting, core drilling, and GPR scanning contractor. The company does not sell bagged mix, run a batch plant, or quote concrete placement. Our family crew handles interior demolition, exterior demolition, and licensed heavy-equipment work, then leaves a clean opening for the trade that places new concrete. This guide covers the mix at a high level, then the handoff after a slab is opened.
How to Make Concrete From Cement, Water, and Aggregate
Cement is the powder. Concrete is the finished material. Portland cement is made by heating limestone and clay, then grinding the clinker. Mix that powder with water and it hydrates. The paste glues sand and stone together. Mortar is cement, sand, and water. Concrete adds coarse aggregate, usually gravel or crushed stone, so it can carry load.
A small batch uses the same parts as a truck. Dry cement and aggregate go in first. Water goes in next, only enough to wet the mix. The U.S. Environmental Protection Agency's concrete washout guidance describes concrete as cement, water, and aggregate, and names hydration as the reaction that binds them. That reaction starts as soon as water meets cement. It does not wait for the crew to finish wheeling the batch to the hole.
What the water does
Water makes the mix workable, and it also sets the strength. The water-cementitious ratio is the weight of water divided by the weight of cement and other cementitious materials. More water makes the batch easier to move. It also leaves a weaker, more porous slab after it hardens. ASTM C94 lets a crew add water once on arrival if three limits hold. The slump is still low, the maximum ratio is not exceeded, and the water is mixed with at least 30 more drum revolutions.
That is why "add a little water so it flows" is a bad field habit. The delivery ticket is the record of water already in the load, including water the plant held back for the site. Water added later in the discharge, or past what the ticket allows, makes the load nonconforming. A homeowner mixing one bag by eye does not have that ticket. A commercial floor patch usually does.
Ready-Mix and Site Mixing Are Not the Same Job
Bagged concrete already contains cement, sand, and stone. You add water and mix. It fits a post hole, a small pad, or a short patch when the volume is tiny and access is open. It is a poor plan for a trench across an occupied floor, a thickened equipment pad, or any opening with a structural detail.
Ready-mix is batched at a plant to a named mix design. The truck ticket should show the plant, the mix, the volume, the time water first met cement, and the drum-revolution count. The purchaser, often the general contractor or the concrete subcontractor, owns the mix selection. A demolition crew should not pick a strength, a slump, or an admixture on the truck's behalf.
The 90-minute window
ASTM C94 requires discharge within 90 minutes of first adding water to the cement, or before 300 drum revolutions, whichever comes first. The purchaser can waive that limit. Hot weather can shorten the window. A set retarder can change it only when the specification allows. The clock is not a suggestion for the crew that is still moving furniture out of the bay.
That window is one reason a cut opening has to be ready before the truck is ordered. If the edges are still ragged, the base is full of debris, or the scan is unfinished, the concrete is aging in the drum while the site catches up. Rejecting a load is expensive. Placing a load that has already stiffened is worse.
What a Slab Opening Needs Before New Concrete
Knowing how to make concrete does not tell you whether the hole is ready. After interior demolition or a saw cut, the opening still has old edges, dust, and often steel or conduit the original slab was hiding. The concrete contractor needs a stable base, sound edges, and a clear note on what the new concrete has to do.
Loose rubble does not count as a base. Standing water changes the ratio the moment the mix hits it. A feathered edge breaks off. If the opening is a trench for pipe or conduit, the lines have to be in place, supported, and inspected before anyone orders concrete. If it is a core that should stay open for a utility, it should not be filled at all.
Scan and cut before anyone orders a truck
All Pro's core drilling and GPR scanning work is how a Georgia crew finds a safe place to open concrete. Ground-penetrating radar and a concrete slab scan look for rebar, post-tension cables, and utilities before the saw or the core rig starts. A GPR scan before concrete cutting is the planning step. It is not a substitute for the mix design, and it is not the pour.
Cut edges should be square enough for the detail the engineer issued. Concrete core drilling leaves a round hole for a pipe or sleeve. Sawing leaves a straight opening for a trench or a removal. Neither one is a finished floor. Concrete cutting on a Georgia project should name the opening size, the protection, and who patches afterward.
Cement, Ready-Mix, and a Slab Opening Compared
These are different jobs. Mixing a bag, ordering a truck, and closing a cut floor do not share a scope.
QuestionBag or site mixReady-mix truckCut slab openingWhat it isCement, sand, stone, and water are mixed on site.A plant delivers a batch to a named mix design.Cutting, coring, or demolition opens an existing floor.Who owns the mixThe person mixing the bag follows the product instructions.The purchaser and the concrete contractor own the mix design.The demolition, cutting, or scanning crew does not own the mix.Time limitThe crew uses the batch before it stiffens.ASTM C94 sets 90 minutes or 300 revolutions.The opening must be ready before the truck is ordered.All Pro roleAll Pro does not sell or mix concrete.All Pro does not place ready-mix.All Pro handles demolition, cutting, core drilling, or GPR scanning.
Who Places the Concrete After Demolition
The trade that places concrete is not automatically the trade that removed it. All Pro cuts, cores, scans, and demolishes. A concrete contractor, or the ready-mix producer working under that contractor, batches and places the new material. Treating those as one purchase hides the handoff, the mix responsibility, and the cure time.
A published page on concrete pour-back work explains why a project team cares about the gap between removal and restoration. That page is about schedule. This one is about the material. Concrete pour-back cost is a third question: what a Georgia quote should separate. Do not pull a price from a patio calculator and call it the cost to close a structural opening.
What to hand the concrete contractor
Send the opening list with dimensions, floor level, and thickness if it is known. Note whether steel was cut, whether cables were present, and whether the scan is already done. Attach the engineer's detail if there is one. Say who owns forming, who owns dowels, and who protects the occupied space while the concrete cures.
Also say what All Pro already finished. A clean saw cut and a scanned slab are useful. They are not a mix design, a slump target, or a finish spec. Concrete demolition services cover removal of the old material. Slab removal in a tight space is still removal. The new concrete is a different contract unless that contractor has agreed, in writing, to place it.
Washout is part of the placement, not the demo
Chutes, pumps, wheelbarrows, and tools have to be washed before the concrete hardens. The EPA concrete washout guidance says that washwater is caustic, with a pH near 12, and that it should be collected in leak-proof containers so it does not reach soil or storm drains. Dumping it on the ground can harm plants and surface water. The same sheet tells crews to keep washout away from drains and to recycle the water and solids when they can.
That duty sits with the crew that placed the concrete. A demolition crew should not leave a slurry trail as a substitute for a washout. On a Georgia site, stormwater rules can also apply once slurry can leave the property. Ask the concrete contractor where the washout will sit before the truck arrives, not after the chute is already dripping.
A Practical Sequence for a Georgia Project Team
Use this order when an existing slab has to be opened and later closed. It keeps the mix decision with the concrete trade and the opening with the demolition trade.
Confirm whether the opening stays open for a utility or must be closed.
Scan for rebar, post-tension cables, and live utilities before cutting or coring.
Cut or demolish only the area the drawing names, and haul the debris.
Leave edges, base, and any exposed steel in the condition the detail requires.
Have the concrete contractor choose the mix, the truck, and the delivery time.
Place, finish, and cure only after the opening is ready and the ticket still allows discharge.
Contain washout, then return the floor to the next trade.
Exterior work follows the same split. Exterior demolition can take out a pad, a wall, or a wrecked structure. It does not design the replacement concrete. If the old concrete is leaving the site, concrete recycling after demolition is a hauling and disposal question, separate from the new mix.
Family crews with more than 15 years in Georgia demolition still see the same failure. Someone orders concrete because the saw is on site, then discovers the scan is incomplete or the engineer has not issued a patch detail. The truck's 90-minute clock does not pause for that meeting.
What This Guide Does Not Decide
This page does not give a bag ratio for a driveway, a patio, or a structural patch. Those ratios belong to the product instructions or to a mix design. It does not set a strength, a slump, or a cure period. An architect or structural engineer owns the detail when the floor has a load or a fire rating.
It also does not say All Pro will place, finish, or quote the new concrete. Phone calls to All Pro are for demolition, concrete cutting, core drilling, and GPR scanning across Georgia. If the next step is a mixer, call a concrete contractor and send them the opening list. If the next step is still the opening, All Pro can review that scope.
Call (470) 345-2816 to review demolition, cutting, and scanning or send the opening list through the contact form.
Frequently Asked Questions
How do you make concrete?
Combine Portland cement, water, sand, and coarse aggregate, then mix until the paste coats the stone. Cement is the binder. Concrete is the binder plus aggregate. Add only the water the product or the mix design allows. Extra water makes the batch easier to place and weaker after it hardens.
Can a crew pour new concrete straight over dirt in a cut opening?
Not if the opening has loose fill, standing water, or an engineered base that was never built. Dirt that pumps or holds water will not support a patch. The concrete contractor should set the base requirement. A demolition crew's job is to remove the old concrete and leave the opening clear, not to invent a subbase.
What is the 90-minute rule for concrete?
Under ASTM C94, ready-mixed concrete is discharged within 90 minutes of first contact between cement and water, or before 300 drum revolutions, whichever comes first, unless the purchaser waives that limit. Hot weather can shorten the usable time. Order the truck only after the opening is ready.
Does All Pro mix or place the new concrete?
No. All Pro Demolition performs interior and exterior demolition, concrete cutting, core drilling, and GPR scanning for Georgia contractors, renovators, developers, and property owners. A concrete contractor or ready-mix supplier handles batching and placement. Ask All Pro to review the opening. Ask the concrete trade to review the mix.
Where should concrete wash water go?
Into a leak-proof washout, not onto soil or into a storm drain. The EPA notes that concrete washwater is caustic, with a pH near 12, and can damage plants and surface water. Set the washout location before the pour. That step belongs to the crew placing the concrete.